Power Cables Insulation and Sheath Extrusion Machine Production Line

Power Cables Insulation and Sheath Extrusion Machine Production Line

Electricity Cables Insulation and Sheath Extrusion CZPT Creation Line

I. Use:
Appropriate for PVC, PE wire cable extrusion

II. Design and style parameter:

No. Product Parameter
one Diameter of main Ф0.4mm-5mm
two Diameter of completed Ф0.8mm-20mm
3 Extrusion potential 100KG/H (Extrusion head open up, comfortable PVC)
four Speed 300m/min
five Center peak of machine 1000mm

III. CZPT checklist

No. Merchandise Qty.
1 Ф500-630  pay off body one set
two Ф70 straightening platform one set
3 Ф50/Ф70/Ф90/Ф120 principal extrusion device 1 set
4 2m pre h2o tank 1 set
five 8m solitary layer U shape h2o tank 1 set
six Ф400/Ф500/Ф630 double wheels drinking water tank monitoring equipment one set
7 9m horizontal wire shop frame one set
eight Ф630 double placement wire get up equipment one set
9 Primary management cabinet(method and temperature system management) 1 set
ten 50kg substance suction machine one set
eleven Drying device one set
12 Ink jet Printer one set
13 Metering device one set

IV. CZPT introduction:
one. Ф400-500 Energetic rigidity wire shell out off device

one) Spool measurement: 500-630 mm or CZPT design and style
2) Shafts topping way: shaft variety
3) Weight: ~300kg
2. Ф70 straightening platform
one) Ф70 solitary groove straightening wheel: 3 pcs
2) Straightening wheel situation: Up and down adjustment dependent on prerequisite
3) Center peak: 1000m
four) General dimension: 480*250*1040mm
5) Fat: 50kg
3. Ф50 major extrusion machine
1) Power: 11KW AC motor + inverter
two) Equipment box: ZYJ-146 Grinding equipment
three) CZPT: Ф50mm, L/D=26:1, Pace: ten-110RPM, Content: SACM-2, area difficult chrome plating right after nitriding treatment method, satisfies for the extrusion of PVC, PE.
four) CZPT tank: Substance: SACM-one, floor nitriding treatment, hardness: HRC60-sixty three, three temperature measurement points.
5) CZPT tank heating: CZPTtric heating, 380V/50HZ, three sections heating section (AL), overall 10KW.
six) CZPT kind of screw tank: Large stress centrifugal admirer, 380V/180W, every section with 1.
Feeding part water cooling.
7) Extrusion head clipping method: CZPT-variety bilateral clamping sort with one temperature measurement position
eight) Total electrical power: 21.54KW
nine) All round dimension: 2200*1000*2500mm
10) Weight  : 1500kg
4. 2m pre h2o tank
one) Material: SUS304 CZPT metal
2) Duration: 2000mm
3) Tank size: 140mm (H)*180mm (W)
4) Motion modifying: 800mm
5) Tank condition: U condition
six) Bodyweight: 70kg
5. 8m one layer U form h2o tank
one) Material: SUS304 CZPT steel
2) Length: 8000mm
3) Tank dimension: 140mm (H)*180mm (W)
4) Overall dimension: 8000*210*1140mm
five) Assist: 3pcs
six) Excess weight: 120KG
6. Ф400 double wheels drinking water tank monitoring machine
one) Electricity: 4KW AC motor + inverter
two) Monitoring kind: Double wheels h2o tank
3) Monitoring pace: Max 300m/min
4) Tracking wheel: Aluminum alloy materials, U condition four grooves
5) Diameter of monitoring wheel: Ф400mm
6) Tank physique content: SUS304 stainless metal
seven) All round dimension: 1260*780*1160mm
eight) Fat: 480kg
seven. 9m horizontal wire shop frame
one) Store type: Horizontal sort, 9m long
two) Electrical power: one.5KW motor +10kg CZPTic clutch
three) Range of tension power: 350N, cost-free adjustment
4) Transmission: Multi-core wire rope
five) Duration of wire keep: In 150m
6) Wire guiding wheel: Ф300mm, Aluminum alloy content, ten wheels+9wheels
7) Anti-collision unit: Compressed spring
eight) Control cupboard: DC-24 electricity source motor inverse control, tension power adjustment
9) Total dimension: 9000*600*2600mm
ten) Bodyweight: 650kg
eight. Ф630 double situation wire consider up machine
1) Wire cable: Max 6mm
2) Speed: 200m/min
3) Energy: 2.2KW AC motor *two, inverter pace change, velocity match with primary equipment.
4) Metering gadget: CZPT stop when reach to established price
5) Sparker: CZPT alarming when spark breakdown
six) Wire arranging: Ф30mm screw lead*2
seven) All round dimension: 1300*800*1160mm
eight) Bodyweight: 600kg
nine.   Drying machine
one) Quantity: 75kg
two) Alarming: No content alarming
three) Control: PID control, LED exhibit
ten. 50kg material suction equipment
1) Potential: 50kg/h
2) Motor: one KW
three) Diameter of feeding pipe: Ф38mm
11. Meter unit
1) Variety: Solitary route metering
2) Diameter of metering wheel: Ф159mm
three) Metering: 500mm/r
4) All round dimension: 200*one hundred forty*360mm
5) Excess weight: 15kg
twelve.   Higher velocity printer:
1) CZPT speed: 200m/min
two) CZPT wheel: Outer diameter Ф100mm, interior diameterФ20mm
3) CZPT top quality: Meets UL,CSA,VDE,JIS,T-MARK CZPT
thirteen.   Main manage cabinet (program and temperature technique manage)
1) Electricity: 380V, 50HZ, 3Phase
2) Process management: Change handle machine energy, button handle device functioning condition.
three) Temperature control: 5 manage area, Temperature control desk
four) Power management: Learn change and every department change manage
five) Motor management: CZPT control
six) Implies desk handle: 5 section temperature management precise management 5 temperature zones.
7) Handle of accent add-ons: In one manage system, large automation amount.

V. Reference photos:

VI. CZPT & CZPT
We can pack it by pallet, or in accordance to the customers’ particular requirements.

VII. Our Companies
In purchase to assure the consumers are in a position totally to work the equipment, if the client require, we can help customer training, contains:
1. Proper running manner
two. Right servicing way
3. Get rid of basic dilemma

VIII. RFQ:
Expensive buyer, 
Thanks for your viewing.
For much better suggestion, pls tell us the comply with data when sending us inquiry.
one. Cable construction and size
2. CZPT substance
3. Photographs of cable
four. Cable main mateiral

Many thanks and very best regards

 

Power Cables Insulation and Sheath Extrusion Machine Production Line